Bid comparison
Three bids, three formats, one honest comparison.
The cheapest bid is usually the one missing the most scope. Enter what each contractor priced and Advistra shows you the gaps rather than the totals.
| Scope category | ||||
|---|---|---|---|---|
| Demolition | ||||
| Plumbing | ||||
| Electrical | ||||
| Flooring | ||||
| Tile & Walls | ||||
| Fixtures | ||||
| Vanity & Cabinetry | ||||
| Countertops | ||||
| Lighting | ||||
| Finishes | ||||
| Labor | ||||
| Permits | ||||
| Total | — | — | — |
Enter each bid using your own category mapping — a blank cell means the contractor did not price that scope.
What each bid includes
Permits & inspections
Demolition & disposal
Named waterproofing system
Written material allowances
Exhaust vented outside
Drywall & paint repair
Daily cleanup & floor protection
Written change-order pricing
Workmanship warranty (1 yr+)
Proof of insurance
Bid risk analysis
- No structural risks detected yet. Fill in totals and inclusions to surface gaps between bids.
